3.4kW Ground Mount Solar Panel Installation on BC’s Sunshine Coast

This ground mount project was designed, installed and commissioned for a home in Madeira Park in the summer of 2020. These customers live off-grid so they were looking for energy storage as well as energy generation. Shift designed a 9 panel, 3.4kW solar system and paired it with a 5kW/13.5kWh Tesla Powerwall. These customers will now have more than enough power to run their off-grid home for years to come.

Shift delivers quality, turn-key solar solutions to each and every customer, which means that we take care of every aspect, from system design, to installation and commissioning. Give us a call and let us show you why we are the highest rated solar installation company in British Columbia.

Key Project Statistics
Energy Offset: 100%
Number of Panels: 9
System Size: 3.4kW